Zhengzhuo supplied Zhengzhuo IP Series Uninterruptible Power Supply (UPS) and DC Power Supply Series for the Niger-Benin Pipeline Project.
The Niger-Benin Pipeline Project starts from Koulele Initial Station in Niger and ends at Sèmè Port of Benin, with a total length of 1,980 kilometers. Its Benin section stretches 675 kilometers, equipped with three crude oil pump stations, together with auxiliary facilities including a 28.16-kilometer subsea pipeline and a 160,000 DWT single-point mooring system. Delivering strong impetus to energy connectivity and economic development across West Africa, the project stands as a landmark China-Africa energy cooperation initiative under the Belt and Road Initiative.

